12 September 202616°CThimphu
All stories
BBS

Hydropower projects designed to withstand GLOF risks, says MoENR Minister

By sangye

Photo: PHPA II Project Authority Being built along river basins, Bhutan’s hydropower projects are vulnerable to flash floods and Glacial Lake Outburst Floods. As climate change increases the frequency and inten...